Building insulation (2)

Swiss Embassy

In the government quarter of Berlin, the Swiss Embassy was built over the road tunnel of the B96 and the metro. 

To keep the effects of the vibrations of the unregulated mechanical vibrations caused by the traffic away from the embassy building, isoloc was assigned to lay out the receiver insulation.

Since 1999 the part of the building has been standing on various isoloc vibration insulation packs, which are exactly attuned to the individual bearing loads of the building.

In February 2011 the expert Prof. Dr.Ing. W.Stühler carried out a measurement at the Swiss Embassy to test the efficiency and durability of this measure.

The results, according to the statements of the employees of the Embassy as well as the measurement results, were very convincing.

The recipient insulation with our vibration insulation packs is still very good.