|
New building of Swiss Embassy on ISOLOC
Date of installation: in June 1999
Requirements:
Receiver-insulation of the Swiss Embassy in Berlin against vibration influences of the underground train and the street tunnel B96.
ISOLOC-equipment:
Various special ISOLOC insulation packs with different dimensions, tuned to the individual support loads of the building and the disturbing frequencies.
|