to the homepage

your actual basket of goods
 
       
 

New building of Swiss Embassy on ISOLOC

Date of installation:  in June 1999

Requirements:
Receiver-insulation of the Swiss Embassy in Berlin against vibration influences of the underground train and the street tunnel B96.

ISOLOC-equipment:
Various special ISOLOC insulation packs with different dimensions, tuned to the individual support loads of the building and the disturbing frequencies.

   
       
 

In the government quarter in Berlin the Swiss Embassy was built on the street tunnel of the B96. ISOLOC has been considered already in the planning phase to keep vibration influences of the traffic away from the embassy building.